Contenu du message :

Répondre

publié le : 16/08/2013 par SnarieUlcerie
Adresse Email : wkhkjwe444@hotmail.com

Building technics


This became particularly challenging when we needed to reroute the existing facility's storm and sanitary lines. The existing main storm system and overflow was inadequate to the facility's needs; we converted the main system into the overflow and expanded and redirected the overflow into the new system we built as part of the building addition. A portion of this process took place in the same warehouse area where Mouser employees worked eight hours per day, maintaining inventory and filling orders (see picture to the right).
For the office space we were able to do this via the crawlspace beneath the floor. We did not have this luxury in the warehouse. During construction we needed to run temporary lines through the old warehouse without interfering with more than a dozen fully automated http://excavations.comze.com storage racks and an inventory handling system.
 
la question ICI >> Building technics (SnarieUlcerie,16/08/2013)